Jump to content

~~ What we have been up to ~~


AquaSD

Recommended Posts

Haven't had too much time to post lately cause of our upgrade at the shop. We had a huge office right in the middle of our warehouse which took up a lot of retail room. 2 weeks back, we started our huge store remodel, knocking out the office, new cabinetry and dry goods, new 24 feet frag system, and a new fish system.

Here are some pics, hope you like it!

Say Bye bye!

P1190334.jpg

P1190335.jpg

P1190336.jpg

P1190363.jpg

P1190364.jpg

P1190362.jpg

P1190361.jpg

Link to comment
Share on other sites

Wow, that's a lot of crap...

P1190415.jpg

P1190414.jpg

Redoing some lighting and electrical (Marlon got a little excited, even after an all nighter, this was at 5am...)

P1190411.jpg

P1190410.jpg

All cleaned up, some new paint!

P1190426.jpg

P1190425.jpg

Scraping out the old glue. Epoxy going in next!

P1190424.jpg

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...