(Bio)³ Posted November 8, 2013 Share Posted November 8, 2013 Add a bit more PVC before the cap so you can cut and have enough left on both sides of the cut to reglue Sent from my SAMSUNG-SGH-I337 using Tapatalk Link to comment Share on other sites More sharing options...
Bpb Posted November 8, 2013 Author Share Posted November 8, 2013 As in, in case I want to add something else like a calcium reactor? I do appreciate the help. Is the purpose of having the reactor lines BEFORE the return gate valve so pressure will be greater in the primary line? This is just the meat of the manifold, the actual pipe coming off the pump is gonna be a out 12" before the reactor lines branch off. I'm actually not certain my pump would be able to handle another line, as I'm currently skeptical whether it will handle what I have now. I should have gone one step up. Anyone wanna trade a Sicce syncra 3 never seen water for something bigger? Lol. Thanks again hopefully I get this done at some point Link to comment Share on other sites More sharing options...
(Bio)³ Posted November 8, 2013 Share Posted November 8, 2013 Yeah exactly that way you can add more ports for stuff like carx. You can have the gate valves before or after. The primary line is caped and all secondary lines pressurize equally. Sent from my SAMSUNG-SGH-I337 using Tapatalk Link to comment Share on other sites More sharing options...
Recommended Posts
Archived
This topic is now archived and is closed to further replies.